| Dylan Henderson | Spring | 2020 | Design for Cost Production |
| Jewiriya Ahmed | Spring | 2020 | Green Energy, a Clean Solution to Electrical Power Needs in Sudan |
| James Crouse | Fall | 2019 | Wind Turbine Main Component Handling: Measuring and Process Improvement |
| Justin Norman | Fall | 2019 | Design Build Projects |
| Sharon Schultz | Fall | 2019 | The Use of Community Energy for Transitioning Veterans |
| Michael Soha | Fall | 2019 | Renton 737 Innovation Cell |
| Jeremy Staab | Fall | 2019 | Implementation of a New Information Security Division |
| Max Miller | Spring | 2019 | Design Build Projects |
| Mathew Lathrop | Spring | 2019 | Empennage Spar Handling Improvement System |
| Matthew Fitch | Spring | 2019 | Strategic Cultural Alignment in Nave Warfare Centers |
| Brian Watson | Fall | 2018 | Bullfrog Spas Throughput Analysis and Improvements
|
| Kevin Haubrich | Spring | 2018 | American Motors Digital Systems Transformation |
| Cylix Shane | Spring | 2018 | “Kraken” Ultrasonic Hammer Drill |
| Mona Alfarra | Spring | 2018 | Sterilizing Food Menus and Frequently Used Documents System |
| Shruthi Kantharaj | Fall | 2017 | Target Oriented Waste Management |
| Manuel C. Becerra | Fall | 2017 | Implementation of Barcode in Machine Shop |
| Brian P. Jones | Fall | 2017 | Driving Costs Out of Aircraft Manufacturing; the Power of the Tear |
| Estella M. Ang Golds | Spring | 2017 | Retaining Generation X Managers and Preparing the Millennial Workforce During Baby Boomer Retirements |
| Timothy Young | Spring | 2017 | 777 Wing to Body Join Engineering Process Improvements |
| Caleb Summerfelt | Spring | 2017 | Prevention of Forward Momentum |
| Anthony R. Taylor | Fall | 2016 | Data Center Consolidation |
| Juan Chindon Becerra | Fall | 2016 | Scheduling and Planning Methodology for Support Shop |
| Scott Andrew Palmer | Fall | 2016 | Implementation of Lean Six-Sigma for Nutraceutical Research and Development |
| Mohammed Babiker | Spring | 2016 | Green Wayira Solar Powered Water Stations |
| Paul Bishop | Fall | 2015 | Development of a Localized Risk Tool for Natural Disaster and Climate Change Impacts in the Philippines |
| Julie M. Garcia | Spring | 2015 | Virtual Project Management in Microsoft Access 2007 |
| Phoebe L. Vu | Spring | 2015 | Autoclave Installation Project |
| James L Coffman | Spring | 2015 | Facilitating Change Management in the Public Sector, a Case Study |
| Ryan Webster | Spring | 2015 | A Six Sigma Approach to the Reduction of ID Lines in Seamless 5052 Aluminum Tubing |
| Dan Boyd Rottler | Fall | 2014 | Evaluation of Wind Maintenance Services |
| Yoni E. Arrieta | Fall | 2014 | Supply Chain Solutions for the Maintenance Repair and Overhaul Industry |
| Carla Miller Hetzer (Zier) | Fall | 2014 | Quality Assessment of Criteria in Integrated Models for Sustainable Energy Planning |
| Scott T. Bowers | Spring | 2014 | Transforming Build Integration at Boeing Through the Application of T.O.C.A.T.P. |
| Brian S. Baber | Spring | 2014 | Airplane Maintenance Engineering -Organizational Re-Structure Strategy |
| Casey M. Peterson | Spring | 2014 | How to Win Consruction Jobs in a Down Economy: With Case Study |
| Michael Gaul | Spring | 2014 | ARMING CLINICIANS Creating a Culture of Service to Deliver Patient-Centric Technologies in Rural Healthcare |
| Karen Shyne | Fall | 2013 | How Theory of Constraints, Modeling, and Predictive Methodologies Enable More Effective Risk Management |
| Teresa A. Guy | Spring | 2013 | Organizational Expansion at Warp Speed - a Constraints-Based Resource Training Strategy |
| Spyridon Bonatsos | Spring | 2013 | TOC Replenishment Solution at Vivartia (Cyprus) |
| Robin Stebbins | Spring | 2013 | Continuous Improvement Project Structure |
| Ty Van Trimble | Spring | 2013 | Alternative Energy Analysis - a Comparative Investigation of the Various Forms of Alternative Energy, Their Benefits Over Traditional Energy Sources, and Their Application in Business |
| Katherine Gideon | Spring | 2013 | Lessons Learned in Managing Internal Research and Development Projects: A Case Study of Althernative Measurement of Air Space in Lung Tissue |
| Redempta P. Njau | Fall | 2012 | Process Improvement and Effectiveness in Software Project Management Using Agile Process |
| Gary M. McDonagh | Fall | 2012 | Sustaining Clean Water |
| Andre Firoozi | Spring | 2012 | Keeping Eplan Application Up-To-Date |
| Gina G. Fiedler | Spring | 2012 | Enigmatic Anomalies A.K.A. Female Engineers |
| Ricky D. Hyson | Spring | 2012 | A Systems Approach to Organizational Learning Through the Contractor Assurance System |
| Robert E. Olso | Fall | 2011 | Converting Customer Need into an Optimized Project Scope |
| Mauricio Malagon | Fall | 2011 | Caribbean Liquid Sugar - Fair Trade |
| Marshall Thompson | Fall | 2011 | The Effect of Water Meter Accuracy on Distribution System Leakage Stand Determination in the City of Spokane Water System |
| Rick W. Cherf | Fall | 2011 | New Roles and Responsibilities in Preconstruction Services |
| Jesse A. Willett | Fall | 2011 | Kingwood Technology Transfer Project Using Visual Project Management |
| Robert E. Olson | Fall | 2011 | Converting Customer Need into an Optimized Project Scope |
| Mohamed Adam | Summer | 2011 | Quality and Process Improvement in Technical Orgainzations: A Case Study |
| Jared L. Price | Spring | 2011 | Critical Chain Project Management Capability Matruity Model |
| Laura White Watson | Spring | 2011 | Successfully Managing Projects in the Federal Government: A Guide to Better Project Management |
| Brian Birmingham | Spring | 2011 | Lean Product Development Process |
| Anthony Muhinja | Spring | 2011 | TOC and Configuration Change Management in Data Center Labs |
| Thomas J. Mollahan | Spring | 2011 | Human Capital and Small Business Volatility |
| Caroline E. Mathews | Spring | 2011 | Designing and Evaluation “State Systems of Accounting for and Control of Nuclear Material” (Ssacs) Using System Engineering Principles |
| Sukender Reddy Palla | Fall | 2010 | Strategy of a Start-Up: Gold’s Gym in India |
| Marlena L. Ma | Spring | 2010 | Audit of Boston Scientific Cardiac Rhythm Management Group and Apply Operations Management Principles and Theory of Constraints to the Organization and Project Management |
| Maurice L. Calloway | Spring | 2010 | Implementing the Ballanced Scorecard to Translate Information Technology Priorities into Specific Objectives and Measuable Targets |
| James S. Vaux | Spring | 2010 | Conflict Resolution in Construction Management |
| Mathew M. Kirori | Fall | 2009 | Information Technology (It) Operational Assessment |
| David Jason Silver | Fall | 2008 | Creating Effective Performance and Change in an Engineering Organization |
| Brian Hays | Fall | 2008 | Quality Productrs Through Geometric Dimensioning and Tolerancing (GD&T) |
| Stephen A. Shoemaker | Fall | 2008 | Optimization of Subcontract Award Fee Administration |
| Steven R. Wilson | Fall | 2008 | Countering the Trend of Declining Enrollment in Electronics Engineering Technology Education at Spokane Community College. |
| Danna Jo Vermeers | Fall | 2008 | Bandon - Rogue Insulator Replacement Project |
| David A. Silkroski | Spring | 2008 | Application of Critical Path Project Management to a DOD Test Program |
| Joseph B. Eggert | Spring | 2008 | Making CCPM the Way of Doing Business |
| Dana J. Sveum | Spring | 2008 | Skagit Valley Engineering Consultants a Comprehensive Business Plan |
| Marcia L. Pasquarella | Fall | 2007 | an Audit of the Implementation of Critical Chain Project Management in a Multi-Project Environment |
| Darren J. Thompson | Fall | 2007 | Requirements Management Recommendations for Effective Organization Strategy |
| Greg Funk | Fall | 2007 | Risk, Opportunity, and Success Addressing and Balancding Multiple Factors Crucial to the Success of a Project Managementy System Deployed to Support Multi-Lateral Decommissioning Progreams |
| Linda Josephson | Fall | 2007 | Two Cases of Improvement Concepts Applied to Small Manufacturing as a Consultant |
| Brennan John Dunlap | Fall | 2006 | Boeing 787 Final Assembly and Delivery Metrics |
| Claudia B Monroe (Nelson) | Fall | 2006 | Crossing the Chasm: The Challenges Facing a Small Business |
| Mike Thoennes | Fall | 2006 | Global Sourcing Evolution at Warn Industries |
| Michael J. Faulkenberry | Fall | 2006 | Development Plan for Battery Replacement of Gas Meter Encoder Receiver Transmitters (Erts) |
| Jennifer Blaylock | Fall | 2006 | Changing Business Practices: Analysis of Modifying Avista’s Natural Gas Service Work |
| Gregory A. Van Overstraeten | Spring | 2006 | Long Term Requirements Management |
| Kenneth A. Swope | Spring | 2006 | Managing Large Integrated Assembly Operations of Commercial Airframes Utilizing Theory of Constraints |
| Linda Dicken | Fall | 2005 | The New Piper Aircraft: Past, Present…and Future? |
| Sheila R. Stark (Fairchild) | Fall | 2005 | CMMI Implementation on a Boeing Military Program During the Demonstration Portion of Its Life Cycle |
| Michael J. Goodwin | Fall | 2005 | Breaking the Bottleneck; Enhancing Throughput in a Paper Mill |
| Kunchalee Luechapattanaporn | Summer | 2005 | Quality Improvement of Sterilized Egg Production |
| Darren R. Sarver | Spring | 2005 | Engineering Management Case Study of Auburn Machining's Strategy |
| Brian H. Baird | Spring | 2005 | Creating an Exceptional Divestiture Process |
| Richard K. Lefrandt | Spring | 2005 | Applying Marketing TOC Way to Wireless Equipment Vendor |
| Nancy J. George | Spring | 2005 | Accelerating the Integrated Manufacturing Plan |
| Anthony J. Ochoa | Spring | 2005 | Guidelines for Application of Engineering Management to a Non-Profit Organization |
| Curtis King | Spring | 2005 | Within a Titanium Seamless Tube Manufacturing Plant |
| Robert S. Weisbeck | Spring | 2005 | Process Improvement, Mobile Dispatch, South Operating Division of Avista Corporation |
| Renee T. Larocca | Spring | 2005 | Womens and Childrens Free Restaurant Strategic Plan |
| Raymond W Scott | Fall | 2004 | Reducing Flow Time and Cost in Aircraft Manufacturing |
| Paul A. Decker | Spring | 2004 | Bill of Material Strategy for Connexion By Boeing Sm |
| CRAIG S OLSON | Spring | 2004 | Information Technology Sourcing Strategies |
| Seyi L. Onagoruwa | Spring | 2004 | Project Management and System Engineering of Filament/Feedstock Development for Fuysed Desposition Modeling FDM |
| Brian L. Gray | Spring | 2003 | Defining and Improving Dedicated CADCAM Support |
| Mangala R. Lonkar | Spring | 2003 | in Search of Team Excellence - a TOC Approach |
| Shan B. Lovelace | Spring | 2003 | Improving the Digital Pre-Assembly Process |
| Charles Grant Lindsay | Spring | 2003 | Strategy7 Creation Using the Theory of Constraints Think Process |
| Peter V. Chambers | Spring | 2003 | A Theory of Constraints and Six-Sigma Application to Improve Operating Cost Reduction Performance |
| Eunchong Kanchanavaleerat | Spring | 2003 | Strategic Audit of Technology & Innovation of Saint-Gobain Crystals & Detectors at Washougal, Washington |
| Mamie M Boyles | Spring | 2003 | Application of Critical Chain Project Management and Appropriate Performance Measures |
| Russell C. Henderson | Spring | 2003 | Project Selection and Development: Pearson Packaging Systems |
| Michael (Donald) Sowa | Fall | 2002 | Software Reuse: "The Myth" |
| Robert J. McIntosh | Fall | 2002 | Evaluation of the Use of TOC Critical Chain Project Management Scheduling in the Boeing Commercial Structural Loads Group |
| Aimee G. Do | Fall | 2002 | an Aviation Enterprise Resource Planning G Solution Maintenance Planning, Tracking and Inventory |
| Robert A. Hubbard | Fall | 2002 | Modeling of Automated Tester Capacity for Use in Determining Requirements for New Testers |
| Travis C. Johnson | Fall | 2002 | Analysis of an Internal/External Distribution System for the Boeing Company |
| Christopher Edward Ahsmann | Fall | 2002 | Software Reuse: "The Myth" |
| Jason W. Gallo | Fall | 2002 | a Telecommunity Business Case, November 2002 |
| Kathleen M. Brumbaugh | Spring | 2002 | Critical Evaluation of the Use of Engagement Process at the Boeing Company to Solve Engineering Utilization Issues |
| Karen Hildebrand | Spring | 2002 | Modified Parametric Manpower Forecasting |
| Paul Martuch | Spring | 2002 | Risk Management in the Design Phases of Aircraft Modifications |
| Wayne A. Mortensen | Spring | 2002 | Application of the Theory of Constraints Supply Chain Solutions to the Product Cost Improvement Process |
| Bruce E. Wallace | Spring | 2002 | People Engaged Management System |
| Brian D. Fox | Spring | 2002 | Process for Designing the Hydraulic Power Generation System of a Commercial Aircraft Using Systems Engineering Principles |
| David Carroll | Spring | 2002 | A Transition in Environmental Management at Battelle’s Pacific Northwsest Division |
| Gary F. Bergan | Fall | 2002 | Delivery of Maintenance Training Labs and Classrooms to a Military Installation |
| Edward Zielinski | Fall | 2001 | Strategic Development of Measures: How to Develop Meaningful Measures That Cause Desired Behaviours |
| Martin J. Wipp | Fall | 2001 | Reducing Turnover in Technical Organizations |
| Christopher G Collisson | Fall | 2001 | The Effect of Subsidies on New Airplane Development |
| Sam E. Bradley | Fall | 2001 | Knowledge Management in the Regional Business Center, Northwestern Division, US Army Corps of Engineers |
| Masud Saeed Rashid | Fall | 2001 | Lessons Learned: Best Know Method, a Knowledge Transfer Methodology in Project Organization |
| James W. Powers | Summer | 2001 | Making an Engineering Offload Work |
| Robert L. Whittington | Summer | 2001 | Making an Engineering Offload Work |
| Mark L. Younie | Spring | 2001 | an Approach to Successful Collaborative Outsourcing in the Aerospace Industry |
| Phillip Allan Billiard | Spring | 2001 | Simulation in a Shared Resource Environment |
| Nyle T. Miyamoto | Spring | 2001 | Project Prioritisation Analysis (Ppa) Method |
| John G. Pavek | Spring | 2001 | Boeing Commercial Airlines: Customer Engineering - a Case Study of Organizations Issues and Recommendations for Improvements |
| Julia T. Robinson | Spring | 2001 | Role of Senior Tech Fellow in a Functional Engineering Organization |
| Jeffrey A. Stucki | Spring | 2001 | Managing for Suppliers Value in Product Development |
| (Walter) Kent Von Scheliha | Spring | 2001 | Implementing Discretionary Change in the Wing Responsibility Center |
| Michael R. Anderson | Spring | 2001 | Cost and Risk Sharing on the JSF Program: A Model for Supplier Cultivation and Integration |
| Kevin L. Cooley | Spring | 2001 | Developing CH2M Hill's PMDF: An Employee-Driven Competency-Based Development Framework for Project Management |
| Jess Fahland | Spring | 2001 | From Lean to Agile: Software Development's Role in Providing the Organization Opportunities for New Strategies- a Risk Assessment |
| John E. Miller | Fall | 2000 | Reductions in Receiving Inspection Testing Based on Closed Loop Testing Processes |
| Gerald (Jerry) Hartman | Fall | 2000 | Sustaining the Long-Term Health of the Configuration Development Process |
| Rees (Warren) Furbeck | Fall | 2000 | Application of Critical Chain Project Management in a Multiple Program Product Development |
| Morten Lau Hansen | Fall | 2000 | Integrating the Supply Chain with in Flight Entertainment Certification |
| Michael Schulz | Spring | 2000 | Strategic Planning for Agility Using Digital Manufacturing Tools |
| John C. Dickson | Spring | 2000 | Developing a Continuous Improvement Plan for a Boeing Fabrication and Assembly Centre |
| Gregory L. Herzberg | Spring | 2000 | Constraints Management Based Education, Knowledge, and Information |
| Richard Poel | Spring | 2000 | Applying Theory of Constraints to the Design of Military Aircraft |
| Savitha Finch | Spring | 2000 | Organizational Change - Implementing and Managing It Effectively |
| Ryan Repenn | Spring | 2000 | The Price and Offerability Process: A Competitive Advantage -- a 777 Example |
| Jason P. (Jake) Petersen | Spring | 2000 | Applied Design for Manufacturability |
| Michael L. Boler | Spring | 2000 | Industrial Engineering – Organizational Development and Management |
| Danette L. Harris | Spring | 2000 | Quantitative Risk Analysis Using an Integrated Product Team |
| Kirsten Wilson | Spring | 2000 | Understanding How Weather Affects Facility Energy Consumption |
| Josh Robert Johnson | Spring | 2000 | Application of the Balanced Scorecard Approach to Performance Management at Reynolds Metals Company's Longview Reduction Plant |
| James C. Russell | Fall | 1999 | Federated Business Model for Boeing R&D in the Next Decade |
| Richard J. Gessner | Fall | 1999 | The Conflict Behind Engineering Process Improvement |
| Bruce Blaine Turner | Fall | 1999 | Performance Measurements for Small Engineering Design Firms |
| Raymundo M. Tena | Summer | 1999 | Introduction of Training and Certification Modules into Proposed Distributed Learning System |
| Thomas M. Thompson | Summer | 1999 | Team Project: Implementing Initiatives That Increase Shareholder Value |
| Michael M. VanderWel | Summer | 1999 | Team Project: Implementing Initiatives That Increase Shareholder Value |
| Steve Dewayne Berg | Summer | 1999 | Definition of Multimedia Network Architecture for Distributed Business Communication |
| Richard Mutter | Summer | 1999 | Definition of Multimedia Network Architecture for Distributed Business Communication |
| John Raymond Gulczynski | Spring | 1999 | Implementing an Engineering Parametric Estimating Methodology |
| John H. Dungan | Spring | 1999 | The Application of Design for Manufacturability Principles to a Multi-Chip Module Product Line |
| Michael T. Wagoner | Spring | 1999 | Continuous Improvement in a Captive Shop Environment |
| (James) Dan Kinney | Spring | 1999 | Management of Competing Organizations Within a Single Corporation |
| Gregory Waugh | Spring | 1999 | Developing an Engineer for Product Development |
| John G. Peterson | Spring | 1999 | Moving Assembly Processes |
| Richard J. Webber | Spring | 1999 | Increasing Manufacturing Throughput Using Theory of Constraints |
| Derek A. Hartvickson | Fall | 1998 | Development of a Weight Risk Management Tool Using the Monte Carlo Method |
| Terri E. Kalan | Fall | 1998 | Systems Architecture for Skill Teams: A Tool Engineering Study |
| Leland A. Wight | Spring | 1998 | The Cost of Stealth |
| Daniel P. Cossano | Spring | 1998 | Boeing Matrix Organization Structure Audit - Functional Organizations Vs. Integrated Project Teams (Ipts) and Their Relationships |
| Richard A. Leisy | Spring | 1998 | Reward Systems, Linking Pay and Performance |
| Theodore A. Ytsma | Spring | 1998 | Managing Technology for Strategic Breakthroughs |
| David Herdnon Logsdon | Spring | 1998 | Study of Life Cycle Cost Analysis of Pollution Prevention Project |
| Richard John Welnick | Spring | 1998 | Integrated Product Teams: The Impact on Working Relationships with Suppliers |
| David G. Snyder | Spring | 1998 | Reduction of Tooling Fabrication Flow Time Using Theory of Constraints |
| James O. Cappa | Spring | 1998 | Boeing Matrix Organization Structure Audit - Functional Organizations Vs. Integrated Project Teams (Ipts) and Their Relationships |
| Steven J. Lemons | Spring | 1998 | Statistical Sampling of Fastener Mechanical Testing |
| Dan Gwyther Robisch | Spring | 1998 | A Current Analysis of Wagstaff's Quality System Using ISO 9001 and TQM Principles |
| Jerral E. Rhoads | Spring | 1998 | The Design and Creation of KC Help a Non-Profit Serviuces's Design and Creation Using Concepts from World Class Manufacturers |
| Gariann Gelston | Spring | 1998 | Integrating Science and Business: An Engineering Management Approach to Research Projects |
| Clayton L. Creek | Spring | 1998 | Managing the Growth of an Engineered Product Business Unit Using the Theory of Constraints |
| John F. Koehler | Summer | 1997 | Theory of Constraints Application to Telecommunications Provisioning Performance at GST Telecom, Inc. |
| Mark Lee Graves | Spring | 1997 | Quality Engineering Performance Evaluation Criteria |
| Tu Dinh Nguyen | Spring | 1997 | Integrate Theory of Constraints with Software Engineering Institute/Capability Maturity Model |
| Greg Alan Bengeult | Fall | 1996 | Project Scheduling and Control; a Theory of Constraints Approach |
| Charles R. Porter | Fall | 1996 | Interfunctional Research Project Implementation |
| Diane Lynn Heidlebaugh | Summer | 1996 | Goal Setting in Technical Organizations |
| John H. Arslanian | Spring | 1994 | Safety Culture at Kaiser Engineers Hanford Company |