Dylan Henderson | Spring | 2020 | Design for Cost Production |
Jewiriya Ahmed | Spring | 2020 | Green Energy, a Clean Solution to Electrical Power Needs in Sudan |
James Crouse | Fall | 2019 | Wind Turbine Main Component Handling: Measuring and Process Improvement |
Justin Norman | Fall | 2019 | Design Build Projects |
Sharon Schultz | Fall | 2019 | The Use of Community Energy for Transitioning Veterans |
Michael Soha | Fall | 2019 | Renton 737 Innovation Cell |
Jeremy Staab | Fall | 2019 | Implementation of a New Information Security Division |
Max Miller | Spring | 2019 | Design Build Projects |
Mathew Lathrop | Spring | 2019 | Empennage Spar Handling Improvement System |
Matthew Fitch | Spring | 2019 | Strategic Cultural Alignment in Nave Warfare Centers |
Brian Watson | Fall | 2018 | Bullfrog Spas Throughput Analysis and Improvements
|
Kevin Haubrich | Spring | 2018 | American Motors Digital Systems Transformation |
Cylix Shane | Spring | 2018 | “Kraken” Ultrasonic Hammer Drill |
Mona Alfarra | Spring | 2018 | Sterilizing Food Menus and Frequently Used Documents System |
Shruthi Kantharaj | Fall | 2017 | Target Oriented Waste Management |
Manuel C. Becerra | Fall | 2017 | Implementation of Barcode in Machine Shop |
Brian P. Jones | Fall | 2017 | Driving Costs Out of Aircraft Manufacturing; the Power of the Tear |
Estella M. Ang Golds | Spring | 2017 | Retaining Generation X Managers and Preparing the Millennial Workforce During Baby Boomer Retirements |
Timothy Young | Spring | 2017 | 777 Wing to Body Join Engineering Process Improvements |
Caleb Summerfelt | Spring | 2017 | Prevention of Forward Momentum |
Anthony R. Taylor | Fall | 2016 | Data Center Consolidation |
Juan Chindon Becerra | Fall | 2016 | Scheduling and Planning Methodology for Support Shop |
Scott Andrew Palmer | Fall | 2016 | Implementation of Lean Six-Sigma for Nutraceutical Research and Development |
Mohammed Babiker | Spring | 2016 | Green Wayira Solar Powered Water Stations |
Paul Bishop | Fall | 2015 | Development of a Localized Risk Tool for Natural Disaster and Climate Change Impacts in the Philippines |
Julie M. Garcia | Spring | 2015 | Virtual Project Management in Microsoft Access 2007 |
Phoebe L. Vu | Spring | 2015 | Autoclave Installation Project |
James L Coffman | Spring | 2015 | Facilitating Change Management in the Public Sector, a Case Study |
Ryan Webster | Spring | 2015 | A Six Sigma Approach to the Reduction of ID Lines in Seamless 5052 Aluminum Tubing |
Dan Boyd Rottler | Fall | 2014 | Evaluation of Wind Maintenance Services |
Yoni E. Arrieta | Fall | 2014 | Supply Chain Solutions for the Maintenance Repair and Overhaul Industry |
Carla Miller Hetzer (Zier) | Fall | 2014 | Quality Assessment of Criteria in Integrated Models for Sustainable Energy Planning |
Scott T. Bowers | Spring | 2014 | Transforming Build Integration at Boeing Through the Application of T.O.C.A.T.P. |
Brian S. Baber | Spring | 2014 | Airplane Maintenance Engineering -Organizational Re-Structure Strategy |
Casey M. Peterson | Spring | 2014 | How to Win Consruction Jobs in a Down Economy: With Case Study |
Michael Gaul | Spring | 2014 | ARMING CLINICIANS Creating a Culture of Service to Deliver Patient-Centric Technologies in Rural Healthcare |
Karen Shyne | Fall | 2013 | How Theory of Constraints, Modeling, and Predictive Methodologies Enable More Effective Risk Management |
Teresa A. Guy | Spring | 2013 | Organizational Expansion at Warp Speed - a Constraints-Based Resource Training Strategy |
Spyridon Bonatsos | Spring | 2013 | TOC Replenishment Solution at Vivartia (Cyprus) |
Robin Stebbins | Spring | 2013 | Continuous Improvement Project Structure |
Ty Van Trimble | Spring | 2013 | Alternative Energy Analysis - a Comparative Investigation of the Various Forms of Alternative Energy, Their Benefits Over Traditional Energy Sources, and Their Application in Business |
Katherine Gideon | Spring | 2013 | Lessons Learned in Managing Internal Research and Development Projects: A Case Study of Althernative Measurement of Air Space in Lung Tissue |
Redempta P. Njau | Fall | 2012 | Process Improvement and Effectiveness in Software Project Management Using Agile Process |
Gary M. McDonagh | Fall | 2012 | Sustaining Clean Water |
Andre Firoozi | Spring | 2012 | Keeping Eplan Application Up-To-Date |
Gina G. Fiedler | Spring | 2012 | Enigmatic Anomalies A.K.A. Female Engineers |
Ricky D. Hyson | Spring | 2012 | A Systems Approach to Organizational Learning Through the Contractor Assurance System |
Robert E. Olso | Fall | 2011 | Converting Customer Need into an Optimized Project Scope |
Mauricio Malagon | Fall | 2011 | Caribbean Liquid Sugar - Fair Trade |
Marshall Thompson | Fall | 2011 | The Effect of Water Meter Accuracy on Distribution System Leakage Stand Determination in the City of Spokane Water System |
Rick W. Cherf | Fall | 2011 | New Roles and Responsibilities in Preconstruction Services |
Jesse A. Willett | Fall | 2011 | Kingwood Technology Transfer Project Using Visual Project Management |
Robert E. Olson | Fall | 2011 | Converting Customer Need into an Optimized Project Scope |
Mohamed Adam | Summer | 2011 | Quality and Process Improvement in Technical Orgainzations: A Case Study |
Jared L. Price | Spring | 2011 | Critical Chain Project Management Capability Matruity Model |
Laura White Watson | Spring | 2011 | Successfully Managing Projects in the Federal Government: A Guide to Better Project Management |
Brian Birmingham | Spring | 2011 | Lean Product Development Process |
Anthony Muhinja | Spring | 2011 | TOC and Configuration Change Management in Data Center Labs |
Thomas J. Mollahan | Spring | 2011 | Human Capital and Small Business Volatility |
Caroline E. Mathews | Spring | 2011 | Designing and Evaluation “State Systems of Accounting for and Control of Nuclear Material” (Ssacs) Using System Engineering Principles |
Sukender Reddy Palla | Fall | 2010 | Strategy of a Start-Up: Gold’s Gym in India |
Marlena L. Ma | Spring | 2010 | Audit of Boston Scientific Cardiac Rhythm Management Group and Apply Operations Management Principles and Theory of Constraints to the Organization and Project Management |
Maurice L. Calloway | Spring | 2010 | Implementing the Ballanced Scorecard to Translate Information Technology Priorities into Specific Objectives and Measuable Targets |
James S. Vaux | Spring | 2010 | Conflict Resolution in Construction Management |
Mathew M. Kirori | Fall | 2009 | Information Technology (It) Operational Assessment |
David Jason Silver | Fall | 2008 | Creating Effective Performance and Change in an Engineering Organization |
Brian Hays | Fall | 2008 | Quality Productrs Through Geometric Dimensioning and Tolerancing (GD&T) |
Stephen A. Shoemaker | Fall | 2008 | Optimization of Subcontract Award Fee Administration |
Steven R. Wilson | Fall | 2008 | Countering the Trend of Declining Enrollment in Electronics Engineering Technology Education at Spokane Community College. |
Danna Jo Vermeers | Fall | 2008 | Bandon - Rogue Insulator Replacement Project |
David A. Silkroski | Spring | 2008 | Application of Critical Path Project Management to a DOD Test Program |
Joseph B. Eggert | Spring | 2008 | Making CCPM the Way of Doing Business |
Dana J. Sveum | Spring | 2008 | Skagit Valley Engineering Consultants a Comprehensive Business Plan |
Marcia L. Pasquarella | Fall | 2007 | an Audit of the Implementation of Critical Chain Project Management in a Multi-Project Environment |
Darren J. Thompson | Fall | 2007 | Requirements Management Recommendations for Effective Organization Strategy |
Greg Funk | Fall | 2007 | Risk, Opportunity, and Success Addressing and Balancding Multiple Factors Crucial to the Success of a Project Managementy System Deployed to Support Multi-Lateral Decommissioning Progreams |
Linda Josephson | Fall | 2007 | Two Cases of Improvement Concepts Applied to Small Manufacturing as a Consultant |
Brennan John Dunlap | Fall | 2006 | Boeing 787 Final Assembly and Delivery Metrics |
Claudia B Monroe (Nelson) | Fall | 2006 | Crossing the Chasm: The Challenges Facing a Small Business |
Mike Thoennes | Fall | 2006 | Global Sourcing Evolution at Warn Industries |
Michael J. Faulkenberry | Fall | 2006 | Development Plan for Battery Replacement of Gas Meter Encoder Receiver Transmitters (Erts) |
Jennifer Blaylock | Fall | 2006 | Changing Business Practices: Analysis of Modifying Avista’s Natural Gas Service Work |
Gregory A. Van Overstraeten | Spring | 2006 | Long Term Requirements Management |
Kenneth A. Swope | Spring | 2006 | Managing Large Integrated Assembly Operations of Commercial Airframes Utilizing Theory of Constraints |
Linda Dicken | Fall | 2005 | The New Piper Aircraft: Past, Present…and Future? |
Sheila R. Stark (Fairchild) | Fall | 2005 | CMMI Implementation on a Boeing Military Program During the Demonstration Portion of Its Life Cycle |
Michael J. Goodwin | Fall | 2005 | Breaking the Bottleneck; Enhancing Throughput in a Paper Mill |
Kunchalee Luechapattanaporn | Summer | 2005 | Quality Improvement of Sterilized Egg Production |
Darren R. Sarver | Spring | 2005 | Engineering Management Case Study of Auburn Machining's Strategy |
Brian H. Baird | Spring | 2005 | Creating an Exceptional Divestiture Process |
Richard K. Lefrandt | Spring | 2005 | Applying Marketing TOC Way to Wireless Equipment Vendor |
Nancy J. George | Spring | 2005 | Accelerating the Integrated Manufacturing Plan |
Anthony J. Ochoa | Spring | 2005 | Guidelines for Application of Engineering Management to a Non-Profit Organization |
Curtis King | Spring | 2005 | Within a Titanium Seamless Tube Manufacturing Plant |
Robert S. Weisbeck | Spring | 2005 | Process Improvement, Mobile Dispatch, South Operating Division of Avista Corporation |
Renee T. Larocca | Spring | 2005 | Womens and Childrens Free Restaurant Strategic Plan |
Raymond W Scott | Fall | 2004 | Reducing Flow Time and Cost in Aircraft Manufacturing |
Paul A. Decker | Spring | 2004 | Bill of Material Strategy for Connexion By Boeing Sm |
CRAIG S OLSON | Spring | 2004 | Information Technology Sourcing Strategies |
Seyi L. Onagoruwa | Spring | 2004 | Project Management and System Engineering of Filament/Feedstock Development for Fuysed Desposition Modeling FDM |
Brian L. Gray | Spring | 2003 | Defining and Improving Dedicated CADCAM Support |
Mangala R. Lonkar | Spring | 2003 | in Search of Team Excellence - a TOC Approach |
Shan B. Lovelace | Spring | 2003 | Improving the Digital Pre-Assembly Process |
Charles Grant Lindsay | Spring | 2003 | Strategy7 Creation Using the Theory of Constraints Think Process |
Peter V. Chambers | Spring | 2003 | A Theory of Constraints and Six-Sigma Application to Improve Operating Cost Reduction Performance |
Eunchong Kanchanavaleerat | Spring | 2003 | Strategic Audit of Technology & Innovation of Saint-Gobain Crystals & Detectors at Washougal, Washington |
Mamie M Boyles | Spring | 2003 | Application of Critical Chain Project Management and Appropriate Performance Measures |
Russell C. Henderson | Spring | 2003 | Project Selection and Development: Pearson Packaging Systems |
Michael (Donald) Sowa | Fall | 2002 | Software Reuse: "The Myth" |
Robert J. McIntosh | Fall | 2002 | Evaluation of the Use of TOC Critical Chain Project Management Scheduling in the Boeing Commercial Structural Loads Group |
Aimee G. Do | Fall | 2002 | an Aviation Enterprise Resource Planning G Solution Maintenance Planning, Tracking and Inventory |
Robert A. Hubbard | Fall | 2002 | Modeling of Automated Tester Capacity for Use in Determining Requirements for New Testers |
Travis C. Johnson | Fall | 2002 | Analysis of an Internal/External Distribution System for the Boeing Company |
Christopher Edward Ahsmann | Fall | 2002 | Software Reuse: "The Myth" |
Jason W. Gallo | Fall | 2002 | a Telecommunity Business Case, November 2002 |
Kathleen M. Brumbaugh | Spring | 2002 | Critical Evaluation of the Use of Engagement Process at the Boeing Company to Solve Engineering Utilization Issues |
Karen Hildebrand | Spring | 2002 | Modified Parametric Manpower Forecasting |
Paul Martuch | Spring | 2002 | Risk Management in the Design Phases of Aircraft Modifications |
Wayne A. Mortensen | Spring | 2002 | Application of the Theory of Constraints Supply Chain Solutions to the Product Cost Improvement Process |
Bruce E. Wallace | Spring | 2002 | People Engaged Management System |
Brian D. Fox | Spring | 2002 | Process for Designing the Hydraulic Power Generation System of a Commercial Aircraft Using Systems Engineering Principles |
David Carroll | Spring | 2002 | A Transition in Environmental Management at Battelle’s Pacific Northwsest Division |
Gary F. Bergan | Fall | 2002 | Delivery of Maintenance Training Labs and Classrooms to a Military Installation |
Edward Zielinski | Fall | 2001 | Strategic Development of Measures: How to Develop Meaningful Measures That Cause Desired Behaviours |
Martin J. Wipp | Fall | 2001 | Reducing Turnover in Technical Organizations |
Christopher G Collisson | Fall | 2001 | The Effect of Subsidies on New Airplane Development |
Sam E. Bradley | Fall | 2001 | Knowledge Management in the Regional Business Center, Northwestern Division, US Army Corps of Engineers |
Masud Saeed Rashid | Fall | 2001 | Lessons Learned: Best Know Method, a Knowledge Transfer Methodology in Project Organization |
James W. Powers | Summer | 2001 | Making an Engineering Offload Work |
Robert L. Whittington | Summer | 2001 | Making an Engineering Offload Work |
Mark L. Younie | Spring | 2001 | an Approach to Successful Collaborative Outsourcing in the Aerospace Industry |
Phillip Allan Billiard | Spring | 2001 | Simulation in a Shared Resource Environment |
Nyle T. Miyamoto | Spring | 2001 | Project Prioritisation Analysis (Ppa) Method |
John G. Pavek | Spring | 2001 | Boeing Commercial Airlines: Customer Engineering - a Case Study of Organizations Issues and Recommendations for Improvements |
Julia T. Robinson | Spring | 2001 | Role of Senior Tech Fellow in a Functional Engineering Organization |
Jeffrey A. Stucki | Spring | 2001 | Managing for Suppliers Value in Product Development |
(Walter) Kent Von Scheliha | Spring | 2001 | Implementing Discretionary Change in the Wing Responsibility Center |
Michael R. Anderson | Spring | 2001 | Cost and Risk Sharing on the JSF Program: A Model for Supplier Cultivation and Integration |
Kevin L. Cooley | Spring | 2001 | Developing CH2M Hill's PMDF: An Employee-Driven Competency-Based Development Framework for Project Management |
Jess Fahland | Spring | 2001 | From Lean to Agile: Software Development's Role in Providing the Organization Opportunities for New Strategies- a Risk Assessment |
John E. Miller | Fall | 2000 | Reductions in Receiving Inspection Testing Based on Closed Loop Testing Processes |
Gerald (Jerry) Hartman | Fall | 2000 | Sustaining the Long-Term Health of the Configuration Development Process |
Rees (Warren) Furbeck | Fall | 2000 | Application of Critical Chain Project Management in a Multiple Program Product Development |
Morten Lau Hansen | Fall | 2000 | Integrating the Supply Chain with in Flight Entertainment Certification |
Michael Schulz | Spring | 2000 | Strategic Planning for Agility Using Digital Manufacturing Tools |
John C. Dickson | Spring | 2000 | Developing a Continuous Improvement Plan for a Boeing Fabrication and Assembly Centre |
Gregory L. Herzberg | Spring | 2000 | Constraints Management Based Education, Knowledge, and Information |
Richard Poel | Spring | 2000 | Applying Theory of Constraints to the Design of Military Aircraft |
Savitha Finch | Spring | 2000 | Organizational Change - Implementing and Managing It Effectively |
Ryan Repenn | Spring | 2000 | The Price and Offerability Process: A Competitive Advantage -- a 777 Example |
Jason P. (Jake) Petersen | Spring | 2000 | Applied Design for Manufacturability |
Michael L. Boler | Spring | 2000 | Industrial Engineering – Organizational Development and Management |
Danette L. Harris | Spring | 2000 | Quantitative Risk Analysis Using an Integrated Product Team |
Kirsten Wilson | Spring | 2000 | Understanding How Weather Affects Facility Energy Consumption |
Josh Robert Johnson | Spring | 2000 | Application of the Balanced Scorecard Approach to Performance Management at Reynolds Metals Company's Longview Reduction Plant |
James C. Russell | Fall | 1999 | Federated Business Model for Boeing R&D in the Next Decade |
Richard J. Gessner | Fall | 1999 | The Conflict Behind Engineering Process Improvement |
Bruce Blaine Turner | Fall | 1999 | Performance Measurements for Small Engineering Design Firms |
Raymundo M. Tena | Summer | 1999 | Introduction of Training and Certification Modules into Proposed Distributed Learning System |
Thomas M. Thompson | Summer | 1999 | Team Project: Implementing Initiatives That Increase Shareholder Value |
Michael M. VanderWel | Summer | 1999 | Team Project: Implementing Initiatives That Increase Shareholder Value |
Steve Dewayne Berg | Summer | 1999 | Definition of Multimedia Network Architecture for Distributed Business Communication |
Richard Mutter | Summer | 1999 | Definition of Multimedia Network Architecture for Distributed Business Communication |
John Raymond Gulczynski | Spring | 1999 | Implementing an Engineering Parametric Estimating Methodology |
John H. Dungan | Spring | 1999 | The Application of Design for Manufacturability Principles to a Multi-Chip Module Product Line |
Michael T. Wagoner | Spring | 1999 | Continuous Improvement in a Captive Shop Environment |
(James) Dan Kinney | Spring | 1999 | Management of Competing Organizations Within a Single Corporation |
Gregory Waugh | Spring | 1999 | Developing an Engineer for Product Development |
John G. Peterson | Spring | 1999 | Moving Assembly Processes |
Richard J. Webber | Spring | 1999 | Increasing Manufacturing Throughput Using Theory of Constraints |
Derek A. Hartvickson | Fall | 1998 | Development of a Weight Risk Management Tool Using the Monte Carlo Method |
Terri E. Kalan | Fall | 1998 | Systems Architecture for Skill Teams: A Tool Engineering Study |
Leland A. Wight | Spring | 1998 | The Cost of Stealth |
Daniel P. Cossano | Spring | 1998 | Boeing Matrix Organization Structure Audit - Functional Organizations Vs. Integrated Project Teams (Ipts) and Their Relationships |
Richard A. Leisy | Spring | 1998 | Reward Systems, Linking Pay and Performance |
Theodore A. Ytsma | Spring | 1998 | Managing Technology for Strategic Breakthroughs |
David Herdnon Logsdon | Spring | 1998 | Study of Life Cycle Cost Analysis of Pollution Prevention Project |
Richard John Welnick | Spring | 1998 | Integrated Product Teams: The Impact on Working Relationships with Suppliers |
David G. Snyder | Spring | 1998 | Reduction of Tooling Fabrication Flow Time Using Theory of Constraints |
James O. Cappa | Spring | 1998 | Boeing Matrix Organization Structure Audit - Functional Organizations Vs. Integrated Project Teams (Ipts) and Their Relationships |
Steven J. Lemons | Spring | 1998 | Statistical Sampling of Fastener Mechanical Testing |
Dan Gwyther Robisch | Spring | 1998 | A Current Analysis of Wagstaff's Quality System Using ISO 9001 and TQM Principles |
Jerral E. Rhoads | Spring | 1998 | The Design and Creation of KC Help a Non-Profit Serviuces's Design and Creation Using Concepts from World Class Manufacturers |
Gariann Gelston | Spring | 1998 | Integrating Science and Business: An Engineering Management Approach to Research Projects |
Clayton L. Creek | Spring | 1998 | Managing the Growth of an Engineered Product Business Unit Using the Theory of Constraints |
John F. Koehler | Summer | 1997 | Theory of Constraints Application to Telecommunications Provisioning Performance at GST Telecom, Inc. |
Mark Lee Graves | Spring | 1997 | Quality Engineering Performance Evaluation Criteria |
Tu Dinh Nguyen | Spring | 1997 | Integrate Theory of Constraints with Software Engineering Institute/Capability Maturity Model |
Greg Alan Bengeult | Fall | 1996 | Project Scheduling and Control; a Theory of Constraints Approach |
Charles R. Porter | Fall | 1996 | Interfunctional Research Project Implementation |
Diane Lynn Heidlebaugh | Summer | 1996 | Goal Setting in Technical Organizations |
John H. Arslanian | Spring | 1994 | Safety Culture at Kaiser Engineers Hanford Company |